English Enterprise Carpentry, Carpenter, Omaha, NE
top of page
Search

Banister and Flooring

  • Writer: Anthony English
    Anthony English
  • Mar 4, 2023
  • 1 min read

Replaced sections of flooring with red oak ripped and planed down to match existing flooring as well as routered to keep tongue and groove pattern. (Client will finish flooring). Then installed banister with skirt, wall runner, and 1 3/4" balusters. All stained, painted and finished before install.


















 
 
 

Recent Posts

See All
Water Damage Restoration

Restored water damage to several areas.  First all new drywall in the garage, hallway, both bathrooms and bedroom and bedroom closet...

 
 
 
Porch Renovation

Renovated this porch with all new pressure treated flooring and framed metal lattice.  Far side of lattice hinged for access.

 
 
 
Bar Wrap

Collaborated with the client to do one of the coolest, and most intricate jobs I've ever been a part of.  Wrapping this bar in solid...

 
 
 

Comments


(402) 370-9999

©2019 by English Enterprise Carpentry. Proudly created with Wix.com

bottom of page